Recent work · photographed on site
The work, up close.
Every photo on this page is from a real Bestfix job — boards, testing, pipework and first fix, exactly as they were found and left. Rated 4.8 on Google.
Recent jobs
08 shown
A fully populated consumer unit with RCBO protection on every way, neatly dressed cabling and a clearly numbered circuit schedule.

Multifunction tester in use at the board — the circuit-by-circuit measurement behind an Electrical Installation Condition Report.

Under-sink pipework: flexible tails, isolation valves and a point-of-use water heater plumbed in and pressure checked.

Scorching and heat damage around an old 100A main switch, exposed during fault finding and replaced.

A bathroom back to bare joists and brickwork — the stage where pipe runs and cabling get set out properly before anything is boarded over.

Downlights set out across a finished bathroom ceiling, wired and positioned around the shower enclosure and freestanding bath.

An original MEM voltage-operated ELCB still in service — the sort of ageing protection an inspection flags for replacement.

A light fitting terminated in the loft above insulation — connections made off properly rather than twisted and taped.